CTL Packaging USA

Plastic Containers Manufacturing Facility

This 160,000 sf industrial manufacturing facility built on a 60-acre site utilizes an injection molding process to produce plastic tubes and caps for cosmetics and personal care products. The complex houses production equipment, research and development space, warehouse and distribution operations, plant utilities, raw material storage, maintenance operations, and corporate offices for the client. The precast roof double tees span 92 feet allowing for unobstructed space for process equipment. The 60,000 sf process area includes an overhead bridge crane and a utility piping rack that serves the current two (2) production lines, with capability to expand to a total of eight (8) production lines.

  • Service — General Contracting
  • Architect — IDOM | AEC Engineering
  • 10.5 month schedule